You don't have javascript enabled. Good luck with that.
Pencarian
 Lima Titik Saluran Penghubung di Grogol Petamburan Dikuras
.
photo Istimewa - Beritajakarta.id

Five Connecting Channels in Grogol Petamburan Dredged

Grogol Petamburan Water Resources (SDA) Unit dredges five connecting (PHB) channels in Tomang, Wijaya Kusuma, and Jelambar Urban Villages, West Jakarta.

Total length of these five channels that we dredge is about 1.5 kilometers

Grogol Petamburan SDA Unit Head, Yusuf Kasim said, mud dredging is done in five channels to follow up RW and Urban Village Head requests. "Total length of these five channels that we dredge is about 1.5 kilometers," he stated, Thursday (11/1).

SDA Dept. Focused on Normalizing More Than 1,100 Connecting Channels in Jakarta

These five channels are located on Jalan Widara Raya RW 07, Wijaya Kusuma Urban Village; Jalan Jelambar Madya Raya Kavling Polri RW 09 and Empang Bahagia  RW 06, Jelambar Urban Village.

Then two PHB channels in Tomang Urban Village which are located on Rawa Kepa RW 11 and Tomang Tinggi IV RW 06.

Mud sediment thickness in five channels are varies between 50 to 80 centimeters. About 1,500 sacks full of mud are transported from those five channels every day.

"We dredge all mud sedimentation thus channels can be optimal for storing rainwater," he explained.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye757 personAldi Geri Lumban Tobing