You don't have javascript enabled. Good luck with that.
Pencarian
 Lima Titik Saluran Penghubung di Grogol Petamburan Dikuras

Five Connecting Channels in Grogol Petamburan Dredged

Grogol Petamburan Water Resources (SDA) Unit dredges five connecting (PHB) channels in Tomang, Wijaya Kusuma, and Jelambar Urban Villages, West Jakarta.

Total length of these five channels that we dredge is about 1.5 kilometers

Grogol Petamburan SDA Unit Head, Yusuf Kasim said, mud dredging is done in five channels to follow up RW and Urban Village Head requests. "Total length of these five channels that we dredge is about 1.5 kilometers," he stated, Thursday (11/1).

SDA Dept. Focused on Normalizing More Than 1,100 Connecting Channels in Jakarta

These five channels are located on Jalan Widara Raya RW 07, Wijaya Kusuma Urban Village; Jalan Jelambar Madya Raya Kavling Polri RW 09 and Empang Bahagia  RW 06, Jelambar Urban Village.

Then two PHB channels in Tomang Urban Village which are located on Rawa Kepa RW 11 and Tomang Tinggi IV RW 06.

Mud sediment thickness in five channels are varies between 50 to 80 centimeters. About 1,500 sacks full of mud are transported from those five channels every day.

"We dredge all mud sedimentation thus channels can be optimal for storing rainwater," he explained.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye788 personFakhrizal Fakhri
  2. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye637 personAldi Geri Lumban Tobing
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye628 personTiyo Surya Sakti
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye386 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye361 personNurito